Menu Building Exceptional Environments 717-581-9900

Project Profile

North Allegheny Ridge Wind Farm North Allegheny Ridge Wind Farm North Allegheny Ridge Wind Farm
North Allegheny Ridge Wind Farm

Gamesa Energy, USA, North Allegheny Ridge Wind Farm

Owner: Gamesa Energy, USA
Location: Portage, PA

The North Allegheny Ridge Wind Farm encompasses parts of Cambia and Blair counties north of Blue Knob Mountain near Altoona. Horst Construction and Horst Excavating collaborated on the project and completed both Allegheny Ridge and North Allegheny Ridge Wind Farms simultaneously. Horst Excavating prepared the site with 15 miles of access road to prepare the site for cabling and installation of the 35 wind turbines.

Project Delivery Method

  • General Contractor

Project Type

  • New Construction

Project Size

  • 15 miles, 35 (200 foot tall) wind turbines

Services

  • Cost Management
  • Project Management

Features

  • Infrastructure, Foundations & Electrical Collection
  • Horst prepared the site with 15 miles of access road
  • Installation of cabling
  • Erosion control
  • Constructed massive foundations for 35 (200 foot tall) wind turbines